Uxbridge bridge completes
A new link bridge has been installed at Uxbridge Business Park, connecting two of the five buildings on the site. The second floor bridge provides not only connectivity between the two buildings, but also space for meetings and a café. The project was designed and delivered to a fast-track programme with completion in May 2021.
This project continues our longstanding collaboration on this successful business park with our client Arlington over the last 20 years. We master planned the park in 2001 and since then have designed and delivered all five office plots.